I have a client that would like to put a new roof on a pre-engineered building. It appears that the building was desinged for a 40 psf snow load in addition to the dead load of the structure. In a past project approximately 3 to 4 psf was added to the roof (ceiling, lights, HVAC, sprinklers). The new roof design would add another 4 psf to the roof. Does anyone have experience adding supports to a pre-engineered building?