D
dangnm
Guest
I am designing a foundation for a 80'x120' pre-engineered building in the northeast. I am using 4' frost walls except for the rear wall that has a loading dock with an 8' wall. I orginally designed the foundation with so that the piers/footing would independantly resist the thrust and cooresponding moment. The footings turned out to be very large especially on the loading dock side with the taller wall, 10'-6 square by 2'-0". The contractor wants to try using hairpins with a slab tension design instead of independant piers/footings. Any comments on this design type and references would be helpful. Thanks.