AETX
Structural
- Jun 9, 2021
- 7
It seems the RCSC part 7 asks for the pre tensioned bolts such as Turn of The Nut method to have a sample bolts pre-tested prior installation of the rest of the bolts. Is there anyone familiar with this requirement? Not sure if I am reading this part correctly.
My understanding is that the installation of the turn of the nut method inspection consists of two steps. One is the pre install test of the sample bolts using a calibrated wrench. And the second step the inspector verifies the installed bolts at the connection assembly. Is my understanding correct?
What options is there if bolts are installed but the first step has not been done (the pre install test of the sample bolts is not performed and supplier doesn’t have bolts from the same lot)
Thank you in advance for your help.
My understanding is that the installation of the turn of the nut method inspection consists of two steps. One is the pre install test of the sample bolts using a calibrated wrench. And the second step the inspector verifies the installed bolts at the connection assembly. Is my understanding correct?
What options is there if bolts are installed but the first step has not been done (the pre install test of the sample bolts is not performed and supplier doesn’t have bolts from the same lot)
Thank you in advance for your help.