GEVANCOUVER
Geotechnical
- Oct 20, 2008
- 8
I am designing a single family house which requires preloading. The ground is 6m peat folowed by 10m very soft silty clayey deposits. The property line is 1.5m from an existing new building founded on timber piles. Embankment fill toe starts from the property line. How can one calculate the maximum fill thickness in the first stage to avoid damage to the neighbouring building.