Hello,
Doing a bit of a review on preloading. Does anyone know where I can example calculations for the following on the net:
* Settlements of filling and slab loads
* Creep consolidation
* Required height for preloading to restrict settlements
* Wick drain spacings
* Batter slope design
* Material options
* Preparations steps
* Construction methods
I know that's alot but most of what I find is rubbish. If you help point me in the right direction i would greatly appreciate it!
Cheers
Doing a bit of a review on preloading. Does anyone know where I can example calculations for the following on the net:
* Settlements of filling and slab loads
* Creep consolidation
* Required height for preloading to restrict settlements
* Wick drain spacings
* Batter slope design
* Material options
* Preparations steps
* Construction methods
I know that's alot but most of what I find is rubbish. If you help point me in the right direction i would greatly appreciate it!
Cheers