Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Preserving Benchmarks during Repaving

Status
Not open for further replies.

LocalCM808

Civil/Environmental
Joined
Jun 28, 2017
Messages
5
Location
US
Most counties I believe have a standard spec or procedure on how the Contractor should preserve, protect, or replace a survey monument in case it is disturbed or damaged during repaving procedures. Typical street monuments are embedded into the ground 3+' so it will be difficult to disturb the actual location of the pin. What about mag nails or "y" cuts on the roadway surface. We are repaving a roadway and some of the bench marks are in the form of mag nails and "y" cuts that are going to be disturbed. Not sure why an actual street monument was not installed for these areas. Thanks for your help!
 
If the monuments are disturbed or destroyed they will need to reset by a licensed land surveyor. If you know they are going to be destroyed, be certain to hire the surveyor prior to construction, so he can accurately locate original monuments location.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top