I designed a building last year that is currently 95% complete. The building is used to design and manufacture products and has a 2 story office with a large single story manufacturing area. One architectural feature was to have the second floor exit onto a very large roof deck which was placed above the manufacturing area.
Now that the owner is almost complete, the owner would not like to add some pretensioned awnings to shade portions of the roof deck. The awning has an area of 700 square feet and covers approximately 1/3 of the roof deck. My contract has been amended to include the design two columns to support this canopy (support opposite of these columns will be provided by the building structure). Part of my new contract requires the loads from the canopy to be given to me by the manufacturer. I have talked to the manufacturer and all I get from them are to “design the columns for #2,500” and I have little confidence that these are the correct loads to use.
Has anyone designed a similar system before and if so, how would I go about calculating the loads in the system so I can properly design my support?
As a side note, I am considering giving a load rated system and then tell the manufacturer he cannot exceed a certain load.
Now that the owner is almost complete, the owner would not like to add some pretensioned awnings to shade portions of the roof deck. The awning has an area of 700 square feet and covers approximately 1/3 of the roof deck. My contract has been amended to include the design two columns to support this canopy (support opposite of these columns will be provided by the building structure). Part of my new contract requires the loads from the canopy to be given to me by the manufacturer. I have talked to the manufacturer and all I get from them are to “design the columns for #2,500” and I have little confidence that these are the correct loads to use.
Has anyone designed a similar system before and if so, how would I go about calculating the loads in the system so I can properly design my support?
As a side note, I am considering giving a load rated system and then tell the manufacturer he cannot exceed a certain load.