ok, i got two hydro generators sets,the data are:
RPM: 1000
Turbine: Francis
horizontal
type of the bearings: zoellern
generator: INDAR
weight of the rotor: 2500 kg
this generator is a francis turbine with a horizontal generator with two slide bearings,(zoellern bearings), one on the non drive end that is only a radial one, and in the drive end we´ll find a bearing with radial, and thrust bearings against the generator and against the turbine... the weight of the turbine is 200 kg, and is at a distance of 278 mm of the end of the drive end bearing... and a freewheel with dimensions: 90*1550 and a weight of 3000 kg near the non drive end side, at a distance of 70 mm....
I hope all of you will understand the way it´s mounted, the generator have 4 feets....
the bearings have external feed of oil that goes to a exchanger...to mantain the temperature of the input oil between 40 and 45 º C, we´d mesure exactly the flow of oil and it´s right...
We start up the hydro unit and on low speed, temperatures remain stables on normal values, but when we go to 1000 rpm 100 % of the speed, in ten minutes the temperatures go up very speedly, 30º C in ten minutes, but the temperature on the oil remain low, 35 º C, then we stop the machine cause we are still without load....
The force of the shaft against the turbine thrust bearing is 20 kn with no load, and 33 kn with full load but we had ask to the bearing manufacturer one thrust bearing for a load of 45 Kn, i don´t understand why this so high value of temperature.... when we have to be safe enough....
This freewheel have a excentricity on axial way of 0,6 mm when we see it...i think this could be a cause for the high values of temperature.... cause the temperatures are higher than in the factory, (in factory is only radial text cause we can´t put axial force into the generator), and the diference from factory is the presence of turbine, the freewheel and way it was mounted on the site, we didn´t supervise it.... what do you think? any ideas?? i could give you the values you need...
is it posible a problem of plumb in the erections process?? thanks in advance, i´m really worried about this, and next monday we´ll do some proofs.... and this occurs in the two hidro units....
RPM: 1000
Turbine: Francis
horizontal
type of the bearings: zoellern
generator: INDAR
weight of the rotor: 2500 kg
this generator is a francis turbine with a horizontal generator with two slide bearings,(zoellern bearings), one on the non drive end that is only a radial one, and in the drive end we´ll find a bearing with radial, and thrust bearings against the generator and against the turbine... the weight of the turbine is 200 kg, and is at a distance of 278 mm of the end of the drive end bearing... and a freewheel with dimensions: 90*1550 and a weight of 3000 kg near the non drive end side, at a distance of 70 mm....
I hope all of you will understand the way it´s mounted, the generator have 4 feets....
the bearings have external feed of oil that goes to a exchanger...to mantain the temperature of the input oil between 40 and 45 º C, we´d mesure exactly the flow of oil and it´s right...
We start up the hydro unit and on low speed, temperatures remain stables on normal values, but when we go to 1000 rpm 100 % of the speed, in ten minutes the temperatures go up very speedly, 30º C in ten minutes, but the temperature on the oil remain low, 35 º C, then we stop the machine cause we are still without load....
The force of the shaft against the turbine thrust bearing is 20 kn with no load, and 33 kn with full load but we had ask to the bearing manufacturer one thrust bearing for a load of 45 Kn, i don´t understand why this so high value of temperature.... when we have to be safe enough....
This freewheel have a excentricity on axial way of 0,6 mm when we see it...i think this could be a cause for the high values of temperature.... cause the temperatures are higher than in the factory, (in factory is only radial text cause we can´t put axial force into the generator), and the diference from factory is the presence of turbine, the freewheel and way it was mounted on the site, we didn´t supervise it.... what do you think? any ideas?? i could give you the values you need...
is it posible a problem of plumb in the erections process?? thanks in advance, i´m really worried about this, and next monday we´ll do some proofs.... and this occurs in the two hidro units....