Usman3301
Civil/Environmental
- Jul 11, 2019
- 48
Hi there,
It has been about 16 months since I started my Structural Engineer career. In our design office, I have observed that a lot of times, modifications/changes regarding design projects are exchanged verbally and there's no record of these at all. Sometimes, when things go wrong and there is a need to review changes made previously, there's a lot of blaming and pinpointing.
So, I'd like to know how you guys manage it. Do you have any management tool or docs which keep track of all changes and important information regarding a specific project? Kindly help me out with this.
It has been about 16 months since I started my Structural Engineer career. In our design office, I have observed that a lot of times, modifications/changes regarding design projects are exchanged verbally and there's no record of these at all. Sometimes, when things go wrong and there is a need to review changes made previously, there's a lot of blaming and pinpointing.
So, I'd like to know how you guys manage it. Do you have any management tool or docs which keep track of all changes and important information regarding a specific project? Kindly help me out with this.