Hi i need a solution for a problem.
Problem - when i copy front view and its Projection view (Top, bottom, sides)from sheet1 and paste it to sheet 2 links between front and projection views will be lost is there any option to link the projection views to front view so that when i move the front view all the projections vies will also move with it.
Hi i need a solution for a problem.
Problem - when i copy front view and its Projection view (Top, bottom, sides)from sheet1 and paste it to sheet 2 links between front and projection views will be lost is there any option to link the projection views to front view so that when i move the front view all the projections vies will also move with it.