triathineer
Civil/Environmental
- Apr 7, 2004
- 1
I am wondering what the proper technique is for designing a concrete wingwall attachment for a sloped pipe. From what I've seen and read, I have encountered 2 ways. One way is a vertical headwall with the entrance/exit slab being flat, and the other way is a vertical headwall with the entrance/exit slab matching the slope of the pipe. Can anyone give me a good direction? Thanks.