We have a proposal for the contractor to have a joint of 1.25Cr-1/2 Mo, line to vessel in reformed gas with hydrogen service, that showed a defect in Rx after PWHT to be repair with Inconel 82 and avoid a new PWHT.
After removing the transverse crack the dig area is 1x3/4 " with depth of 9 mm. Weld is to fill with TIG and Inconel 82 3/32" , preheating at 150 C and covering with mineral fiber after weld is completed. After cooling down do X-ray again and put in service, without a new PWHT...
Is there any comment on this procedure?
After removing the transverse crack the dig area is 1x3/4 " with depth of 9 mm. Weld is to fill with TIG and Inconel 82 3/32" , preheating at 150 C and covering with mineral fiber after weld is completed. After cooling down do X-ray again and put in service, without a new PWHT...
Is there any comment on this procedure?