A propped cantilever element (fixed at one end and pinned at the other) loaded with triangular load should produce the bending diagram as following:
Now I have an ETABS model of an underground septic tank. Since walls are connected to foundation at the bottom (fixed), with slab at the top (pinned) and loaded with triangular load of full height; it should behave like a propped cantilever. But the bending moment I am getting doesn't have any possitive moment.
What am I doing wrong here?

Now I have an ETABS model of an underground septic tank. Since walls are connected to foundation at the bottom (fixed), with slab at the top (pinned) and loaded with triangular load of full height; it should behave like a propped cantilever. But the bending moment I am getting doesn't have any possitive moment.