akupikree
Chemical
- Jul 4, 2011
- 18
I have a submersible firewater pump (offshore) with a rated capacity of 1050 m3/hr@12barg. There is a pressure relief valve (PRV) located at the discharge header just before the check valve and the valve is sized based on NFPA 20.
As per my transient study, during pump start-up (pump is running at the full speed), there is high pressure surge occurred in the discharge header. the PRV which is initially closed is too slow in dumping the overpressure. what is the typical time constant of the Firewater PRV to open? I'd appreciate if someone can suggest a solution for this issue.
Thanks in advance.
Fikree