Dear All,
Thank you in advance if you can guide me for a PSV (set at 300 kPag) sized for blocked discharge protecting a BFW deaerator designed at 250 kPag. The suction nozzle of PSV is at 5000 mm below the suction PSV lateral nozzle at the drum...Client complained that this PSV discharges at grade where during winter hot water gets frozen and the splashing creates a hazard, so client wants PSV to discharge in a vessel and then drained to a trench...What would be the basis for sizing this vessel and the drain line to trench by gravity flow?
Thank you in advance.
Thank you in advance if you can guide me for a PSV (set at 300 kPag) sized for blocked discharge protecting a BFW deaerator designed at 250 kPag. The suction nozzle of PSV is at 5000 mm below the suction PSV lateral nozzle at the drum...Client complained that this PSV discharges at grade where during winter hot water gets frozen and the splashing creates a hazard, so client wants PSV to discharge in a vessel and then drained to a trench...What would be the basis for sizing this vessel and the drain line to trench by gravity flow?
Thank you in advance.