hi guys,
Could you please help in calculating head of closed loop system in high rise building.
I am quite confused, as in closed loop piping we dont consider head loss due to elevation(static lift) , i have seen some article on internet in which they have considered some hydro static pressure.
In closed loop system, we consider head loss through piping friction,fittings and equipment like chiller,AHU etc.
but in the article they have considered the static lift also.
Please guide me on this.
I am attaching the file please see pg 81 chapter-7
Could you please help in calculating head of closed loop system in high rise building.
I am quite confused, as in closed loop piping we dont consider head loss due to elevation(static lift) , i have seen some article on internet in which they have considered some hydro static pressure.
In closed loop system, we consider head loss through piping friction,fittings and equipment like chiller,AHU etc.
but in the article they have considered the static lift also.
Please guide me on this.
I am attaching the file please see pg 81 chapter-7