JD P.E.
Mechanical
- Oct 17, 2021
- 79
My question is related to industrial process plant design and engineering.
I understand that early on in the engineering process pumps are roughly estimated in order to provide cost estimates and to beat lead times. My question is how are they sized before system pressure drop is known? What's the typical practice on this? Are there rules of thumb to go by such as Req'd head + X% for piping/fittings, etc? Or do you just handle it via an oversized pump/control valves or VFD?
I understand that early on in the engineering process pumps are roughly estimated in order to provide cost estimates and to beat lead times. My question is how are they sized before system pressure drop is known? What's the typical practice on this? Are there rules of thumb to go by such as Req'd head + X% for piping/fittings, etc? Or do you just handle it via an oversized pump/control valves or VFD?