We have a water reservoir on its roof we are planning to install two vertical turbine type pumps. Each with a flow of 160 m3/hr with ahead of 75 m. We are required to deliver at a demand point a flow from zero to 300 m3/hr with a head of 65 m. The scheme is shown in the attached picture. My questions are;
- Does the scheme seems sensible
- Does a Flow control valve as shown in scheme , works the way it is shown
- Any suggestions with respect to meeting the varying flow demand with constant pressure of 65m (0.6 MPa)
I have little knowledge of such type of pumping/ piping circuits.