rangercap
Civil/Environmental
- Dec 9, 2010
- 9
Anyone have any experience with the design of a waterline used to pump to AND siphon from and large water storage impoundment?
I have a client who only wants to use only line for both purposes, obviously not at the same time. For air release valves for pumping, I have spec'd manual ball valves for air release maintenance. My concern is with sizing the pipe for 350 gpm up to the impoundment, but then utilizing the same line to siphon back down to a water transfer station. This only one part of a larger overall water trucking operation for shale gas development. The line is approximately 4200LF and has an overall elevation change of 400'.
Thanks
Brian
I have a client who only wants to use only line for both purposes, obviously not at the same time. For air release valves for pumping, I have spec'd manual ball valves for air release maintenance. My concern is with sizing the pipe for 350 gpm up to the impoundment, but then utilizing the same line to siphon back down to a water transfer station. This only one part of a larger overall water trucking operation for shale gas development. The line is approximately 4200LF and has an overall elevation change of 400'.
Thanks
Brian