oneintheeye
Structural
- Nov 20, 2007
- 440
checking punching shear of piles, does anyone use the two layers of steel as the area of rebar? I have always used the one layer (in tension zone). seems to be a bit of disagreement in speaking to people on whether 2 layers can be used. i.e. have same rc in top and bottom of slab continuing over pile head.