akvtech
Mechanical
- Nov 4, 2010
- 21
The vendor is fabricating P11 and P22 piping. Spools are placed in an oven for PWHT so the whole part. Afterwards they installed weld-in type thermowells so a second local PWHT was done. Now I find the welds on the thermowells in this B-31.3 piping were installed as a fillet welds and not full pen. They are going to cut these out and reweld and for the 3rd time PWHT these spools.
I'm concerned about the metallurgy being worked so many times.
These are DMW's as the thermowells are 316ss and the pipe 1.25cr and 2.25cr. Any thoughts on the issues this reworking might create? Thanks
I'm concerned about the metallurgy being worked so many times.
These are DMW's as the thermowells are 316ss and the pipe 1.25cr and 2.25cr. Any thoughts on the issues this reworking might create? Thanks