pelelo
Geotechnical
- Aug 10, 2009
- 357
Engineers,
I have a question about the cpt.
I have worked in central florida, USA, for few years and noticed that projects involving CPT it is not required to perform PWP dissipation.
On the other hand, i have worked in few other projects like in Mexico and noticed that the engineer in charged does require pwp dissipation.
My question is: is it mandatory to run pwp dissipation or not?. At least the projects in mexico are dry stack embankments (silt), so i guess the pwp dissipation is useful for predicting consolidation ratio. But in FL, everything is pretty much sand, so i guess pwp dissipation is not needed as sands do not hold water pressures.
Please correct me if i am wrong.
Thanks.
I have a question about the cpt.
I have worked in central florida, USA, for few years and noticed that projects involving CPT it is not required to perform PWP dissipation.
On the other hand, i have worked in few other projects like in Mexico and noticed that the engineer in charged does require pwp dissipation.
My question is: is it mandatory to run pwp dissipation or not?. At least the projects in mexico are dry stack embankments (silt), so i guess the pwp dissipation is useful for predicting consolidation ratio. But in FL, everything is pretty much sand, so i guess pwp dissipation is not needed as sands do not hold water pressures.
Please correct me if i am wrong.
Thanks.