bobintx
Geotechnical
- Dec 3, 2010
- 1
I am designing a cantilever drilled shaft wall, and I am trying to make sure that I am not overdesigning it. I am running a DS section in LPile using Type 2 analysis, then finding the bending stiffness that corresponds to the moment capacity of the section. I then input this EI into PYWall for my DS section stiffness.
Is this method of finding my bending stiffness acceptable? Or is this too conservative because my drilled shaft's internal moment will not ever reach it's capacity?
Thanks.
Is this method of finding my bending stiffness acceptable? Or is this too conservative because my drilled shaft's internal moment will not ever reach it's capacity?
Thanks.