aryan0411
Geotechnical
- Mar 3, 2021
- 5
Basically, I have modelled a dyke section for normal water level conditions(the phreatic line just being beneath the ground level) and I aim to model this dyke section for raising water level conditions(like raising 1m in each stage) so as to understand the stability under higher river levels during floods, so want to know how should I be modelling the various stages of raising water levels in Plaxis.