COEngineeer
Structural
- Sep 30, 2006
- 1,186
Most of our clients are up in the mountain and usually we have a new construction or large remodel. We just now have more and more clients in the Denver metro area. When I look at the building department of vairous counties, they all have 8" min concrete pier with 36" into the soil foundation without any isolated footing(they call it caisson for some reason). Usually on our projects we always use 2x2 footing underneath the sonatube. Shall I start designing the decks in denver metro area to bear on the area of the pier only? Usually soil report suggests to use minimum 2x2 isolated footing. Is it possible to do decks without soil report? Do you do this 3ft sonatube without footing?
Never, but never question engineer's judgement
Never, but never question engineer's judgement