zicoo000
Mechanical
- Nov 26, 2013
- 15
hi every body
I have two lines Feed my project at 8 bar , the first line feed for the landing valve
and other feed zone's and fire hose reel.
in hydraulic calculation of zone sprinkler neglected 7 bar of landing valve ??? or what can i do
pleas advice
I have two lines Feed my project at 8 bar , the first line feed for the landing valve
and other feed zone's and fire hose reel.
in hydraulic calculation of zone sprinkler neglected 7 bar of landing valve ??? or what can i do
pleas advice