Pressure vessel fabricator has 4 pressure vessels that were fabricated 2 years ago. U1As signed off and submitted. Customer did not want to take delivery so they never left the fabrication facility. Now the customer wants to lower the MDMT form -20 to -40 which will require the manufacturer to cut off and replace the nozzles with SA-333 Gr 6 pipe and SA-350-LF2 flanges.
Somewhere I had read that ASME VIII div 1 code applies up until the vessel leaves the manufacturer's facility and if any alteration is made after that point it would be under NBIC and require R-stamp (if required by the jurisdiction or insurance).
But if the vessel has not ever left the OEM facility, could the alteration be made by the OEM, then re-hydro, AI inspect, and then submit a corrected copy of the U1A? I cannot find a time limit on submitting a corrected copy of the U1A.
Somewhere I had read that ASME VIII div 1 code applies up until the vessel leaves the manufacturer's facility and if any alteration is made after that point it would be under NBIC and require R-stamp (if required by the jurisdiction or insurance).
But if the vessel has not ever left the OEM facility, could the alteration be made by the OEM, then re-hydro, AI inspect, and then submit a corrected copy of the U1A? I cannot find a time limit on submitting a corrected copy of the U1A.