WiSEiwish
Structural
- Mar 28, 2013
- 123
If I have a steel moment frame, does the base fixity have an affect on the R value used for seismic design? The R value for a cantilever column system is 1.5, and I wasn't sure if fixing the base of the moment frame would somehow create a combined system of moment frame and cantilever column requiring the use of the lowest R value.