I'm designing a gate house on a fill site, the fill is about 4m deep, 4 yrs old. the area has been used as the entrance to the construction site for those 4yrs with a lot of truck traffic.
There is a guard house at the centre then two lanes on each side (entrance / exit) then two lines of roof slab support columns on gridline G1 & G7.
Doing a raft for those isolated columns is turning into a headache. Any ideas?
There is a guard house at the centre then two lanes on each side (entrance / exit) then two lines of roof slab support columns on gridline G1 & G7.
Doing a raft for those isolated columns is turning into a headache. Any ideas?