ONENGINEER
Geotechnical
- Oct 13, 2011
- 284
I am designing a dry well. The local authorities just recommend to use a 10 year return period for rainfall intensity. As the intensity depends on the rainfall duration i.e. 5, 10, 15, 30, 60 minutes, 1, 2, 6, 12, 24, 36, 72 hours. Which of these duration should be used for a small residential project. Thanks.