Cap07
Structural
- Mar 8, 2008
- 78
Hi,
Question - is the attached detail for a raised floor with 1-1/8" T&G plywood a good way to detail for transferring the shear through the wall down to the mudsill? Specifically, I'm wondering about the nailing of the plywood to the rim joist (with the required edge nailing for the plywood), then nailing the sole plate to the plywood. Thanks in advance for your input.
Cap
Question - is the attached detail for a raised floor with 1-1/8" T&G plywood a good way to detail for transferring the shear through the wall down to the mudsill? Specifically, I'm wondering about the nailing of the plywood to the rim joist (with the required edge nailing for the plywood), then nailing the sole plate to the plywood. Thanks in advance for your input.
Cap