Dear friends,
I've been assigned to do a draft RBI (RISK BASED INSPECTION) study of a hydrotreatment plant. Given to me are all the P&ID and Process Flow Diagram, along with all datum to the corresponding machines. However I'm struggling to find some help on the following issues.:
1) What criteria can you use to establish corrosion loops (CL). Given a plant, what should be the key criteria to delimit which group of piping and equipment belongs to a single corrosion loop?
2) The same question for Inventory Groups. What is the criteria for establishing such groups and how do they affect the consequences of failure? It is suggested that the user select the Inventory groups by the group of equipment he can isolate in case of failure. What if my plant do not have isolation valves. Can the inventory group be a single giant loop?
3) How do you model the piping. Should you do all the piping or select the representative piping inside a corrosion loop. Or should you select the representative piping and also the entrance and exit piping of all equipment. What criteria can you suggest me?
4) I find it extremely difficult to find an online case study and information regarding to the execution of RBI. Can someone kindly offer some documentation that is either a case study or contains some answers to those questions I have above? The recommended practices API 580, API 581 (which I have a physical copy) do not answer my above questions. They are too much theory and too little about application.
Thank you indeed for your help.
YC89
I've been assigned to do a draft RBI (RISK BASED INSPECTION) study of a hydrotreatment plant. Given to me are all the P&ID and Process Flow Diagram, along with all datum to the corresponding machines. However I'm struggling to find some help on the following issues.:
1) What criteria can you use to establish corrosion loops (CL). Given a plant, what should be the key criteria to delimit which group of piping and equipment belongs to a single corrosion loop?
2) The same question for Inventory Groups. What is the criteria for establishing such groups and how do they affect the consequences of failure? It is suggested that the user select the Inventory groups by the group of equipment he can isolate in case of failure. What if my plant do not have isolation valves. Can the inventory group be a single giant loop?
3) How do you model the piping. Should you do all the piping or select the representative piping inside a corrosion loop. Or should you select the representative piping and also the entrance and exit piping of all equipment. What criteria can you suggest me?
4) I find it extremely difficult to find an online case study and information regarding to the execution of RBI. Can someone kindly offer some documentation that is either a case study or contains some answers to those questions I have above? The recommended practices API 580, API 581 (which I have a physical copy) do not answer my above questions. They are too much theory and too little about application.
Thank you indeed for your help.
YC89