I'm working on the details for making an opening in an existing concrete seawall through which a 48" RCP will pass through at one location and a 72" RCP will pass through at another location. The seawall is located in a canal. No drawings or information is available for the seawall other than what will be ascertained from a visual field review.
I'm going over a few options on how to address this situation:
1) Saw cut a rectangular hole 3"-6" larger, on all sides, than the O.D. of the RCP in the seawall. Drill and epoxy in rebar to essentially provide an opening reinforcement detail around the pipe. Fill the interstitial space with concrete/grout.
2) Frame a rectangular opening 3"-6" larger, on all sides, than the O.D. of the RCP with stainless steel channels (or other shape). Saw cut hole, fit RCP, and fill interstitial space with concrete/grout. The steel members would stiffen the opening and transfer the load. This detail would be carried out on the canal side of the wall.
My questions:
1) Has anyone designed for a similar situation in the past and can provide any advice or insight?
2) Any additional options that could be considered?
3) Any pitfalls to avoid?
4) For option 2, would embedding the members in soil be advised?
Any advice or questions for clarification are welcome.
Thanks.
I'm going over a few options on how to address this situation:
1) Saw cut a rectangular hole 3"-6" larger, on all sides, than the O.D. of the RCP in the seawall. Drill and epoxy in rebar to essentially provide an opening reinforcement detail around the pipe. Fill the interstitial space with concrete/grout.
2) Frame a rectangular opening 3"-6" larger, on all sides, than the O.D. of the RCP with stainless steel channels (or other shape). Saw cut hole, fit RCP, and fill interstitial space with concrete/grout. The steel members would stiffen the opening and transfer the load. This detail would be carried out on the canal side of the wall.
My questions:
1) Has anyone designed for a similar situation in the past and can provide any advice or insight?
2) Any additional options that could be considered?
3) Any pitfalls to avoid?
4) For option 2, would embedding the members in soil be advised?
Any advice or questions for clarification are welcome.