In order to limit the Capacitor Outrush current for two 14.4 MVAR and one 18 MVAR 36 kV Capacitor Banks, it was determined that an 800 uH reactor will be required--for a General Purpose Breaker.
What would be the corresponding reactor size when using a Definite Purpose Breaker instead?