Hi!
When an equipment installed on offshore platform usually it is not bolted directly to the deck steelwork.
First a plinth (a structural frame) bolts down to the deck and then the new equipment installs on the top of the plinth.
As far as I know it is good practise to do so, but why I do not know.
Could anybody list reasons for installing of equipment on plinths.
Thank you in advance!!!
When an equipment installed on offshore platform usually it is not bolted directly to the deck steelwork.
First a plinth (a structural frame) bolts down to the deck and then the new equipment installs on the top of the plinth.
As far as I know it is good practise to do so, but why I do not know.
Could anybody list reasons for installing of equipment on plinths.
Thank you in advance!!!