KAR FUNG
Structural
- Oct 11, 2016
- 30
Hi Sir
As per practice, we will carry out maintained load test to verify the pile capacity before carrying out the full string on the working pile. During the maintained load test, the retention load for 200% is 24 hours.
May I know, what is the reason to maintain the 200% load for 24 hours?
Could we make this shorter?
Thanks.
As per practice, we will carry out maintained load test to verify the pile capacity before carrying out the full string on the working pile. During the maintained load test, the retention load for 200% is 24 hours.
May I know, what is the reason to maintain the 200% load for 24 hours?
Could we make this shorter?
Thanks.