Antnyt23
Structural
- Jul 11, 2012
- 81
I have an existing 9'x18' concrete equipment pad reinforced with #4s @24" oc both directions on 4" of 3/4" clean crushed rock with no fines with 3 pieces of equipment on it. I will be adding 2 pieces of equipment to it. What is the best way to analyze this? I'm having trouble figuring out the method and equations used to analyze and determine the adequacy of the slab.
If anyone has some suggestions please let me know.
If anyone has some suggestions please let me know.