andyz22
Geotechnical
- Jun 7, 2011
- 4
We have designed a 5 mt Reinforced soil wall wall on a soft foundation during construction of leveling pad due to groundwater fluctuation water level raised much above ground level and diffcult to work with.
SBC of soil we require is 19 t/m2 (190kPa).The soil strata consists of Clay over 6m below ground.
even after dewatering has been done by suction What will be the economical solution in such conditions to ensure the BearingCapacity and permissible differential settlement
thanks
SBC of soil we require is 19 t/m2 (190kPa).The soil strata consists of Clay over 6m below ground.
even after dewatering has been done by suction What will be the economical solution in such conditions to ensure the BearingCapacity and permissible differential settlement
thanks