Hello mates, so here's the issue. I have 2 towers connected together at a certain level with a bridge. I've done my analysis, and hinged connectivity between bridge and the floor slab was structurally the best.
My question: does the detailing presented in the attached image, by not providing enough development length for moment transfer, considered enough for achieving hinged connectivity?