calculor1
Structural
- Sep 16, 2007
- 52
This is probably too long but here goes. Some background...existing roof consisting of owsj joists spaced @5.5' spaning 42 ft. Arch needs to add 20psf DL to roof. I came up with two scenarios..1.reinforce existing owsj which is very labour intensive but cheap materials and option 2. add beams between exiting owsj, effectively reducing TA to 2.75'...very costly for materials cheaper labour. Each option turns out to be too expensive, does anybody have any other possible solutions or suggestions. There are a total of 35 beams/owsj to be considered.
thanks
thanks