ASA20
Mechanical
- Jul 13, 2005
- 4
I have space constrain on a relief platform which has a lenght of 6000mm,i want to carry out piping layout of the relief system which has an 8" 900#RJ ristriction orifice which is placed inbetween a 10" ball valve and an 8" ball valve.I have to considered the straight run reqiurement of 7930mm upstream and 1270mm downstream of the risriction orifice.What do you recommend