Hello to all...I would like to ask regarding the very silty soil found in our project site if it is ok or not to remove this unsuitable material before contructing 250nos. three storey houses(ground floor area: 8m x 13m).
As per soil investigation report the sieve analysis for 3 out of 6 boreholes have an average of 20% passing percentage in .063mm sieve size from -0.5m to -2.5m depth.
I would like to have a second technical opinion since it was recommended to remove only 0.3m of unsuitable soil and replace it with suitable material. Is it enough to remove only 0.3 of the unsuitable soil?
Many Thanks in advance!
As per soil investigation report the sieve analysis for 3 out of 6 boreholes have an average of 20% passing percentage in .063mm sieve size from -0.5m to -2.5m depth.
I would like to have a second technical opinion since it was recommended to remove only 0.3m of unsuitable soil and replace it with suitable material. Is it enough to remove only 0.3 of the unsuitable soil?