structuralengr89
Structural
- Jun 28, 2006
- 108
As the title implies, I have an old PEMB that has experienced significant settlement in the last 2 bays due to expansive soils. The owner doesn't have the money to rebuild and I've considered suggesting he demo the last 2 bays and creating a new end wall on the remaining building. Does anyone see any issues with this if the lateral x-bracing is not in the last 2 bays? The building is not very tall. I would construct a new grade beam and have studs span the end wall from slab to end frame (previous interior frame).