i have isolated footing with depth 1.2 meter casted already in the site but we need to add new column is very near to the edge of it has heavy load
we need to change this footing to be combind footing to be suitable with the new sutiation.
the steps of repair as below:
1- rough the surface of old footing from all side.
2- we drill in old footing for the bottom bar for 30 cm deep then we fill the hole with epoxy material.
3-we put the steel bar for the new footing in that hole.
4-we cast the new footing with 20 cm concrete above the old footing with new steel layer at the top the total depth became 1.4 meter for the combind footing.
what do you think of that concept of repair?
is that right way or not?
i have isolated footing with depth 1.2 meter casted already in the site but we need to add new column is very near to the edge of it has heavy load
we need to change this footing to be combind footing to be suitable with the new sutiation.
the steps of repair as below:
1- rough the surface of old footing from all side.
2- we drill in old footing for the bottom bar for 30 cm deep then we fill the hole with epoxy material.
3-we put the steel bar for the new footing in that hole.
4-we cast the new footing with 20 cm concrete above the old footing with new steel layer at the top the total depth became 1.4 meter for the combind footing.
what do you think of that concept of repair?
is that right way or not?