tonyfahres
Civil/Environmental
- Oct 11, 2012
- 3
A client asked me a question concerning a structural repair of a concrete pipe conduit. The conduit transports settled water to filter beds as part of the treatment process. Ne concrete is being formed one of the walls of the conduit. The question is when can the conduit be filled and put back into service? Strength is not the concern, leakage and water loss is what we want to try to avoid. Are there any applicable guidelines for this? I am trying to find some background so I can say a number less than 28 days as this is something that needs to be in service sooner than later. Much Thanks!