MechCC
Mechanical
- Mar 11, 2013
- 13
Hi all
Can anybody help with my question below:
If Sec 8.1.6.4.2 (Preheat or Controlled Deposition Welding Methods as Alternatives to Postweld Heat Treatment) of API 510 was followed instead of doing a PWHT for a repair on a vessel that was originally stress relieved, will it change the vessel’s HT status?
Thanks,
Can anybody help with my question below:
If Sec 8.1.6.4.2 (Preheat or Controlled Deposition Welding Methods as Alternatives to Postweld Heat Treatment) of API 510 was followed instead of doing a PWHT for a repair on a vessel that was originally stress relieved, will it change the vessel’s HT status?
Thanks,