enggmom
Civil/Environmental
- Sep 23, 2011
- 2
We are currently repointing the masonry on a 40 yr old building. The mortar that is being removed is very hard (Type M perhaps). We are repointing with Type N and it's cracking. We did a mock up with Type O and it cracked within 20 mins. I suspect the procedure the mason followed for the mock up was not correct. I know for sure he did not wet the joints in advance of placing the mortar. Any ideas on why the mortar is cracking and suggestions on what to use? I am also looking for some reassurance that repointing load bearing masonry with Type O mortar is acceptable.