Does NFPA 13 indicate at what point the AHJ needs to be involved and/or a licensed contractor should be contacted when replacing sprinkler heads - like for like.
Can an owner replace 4, 10, 50 heads..... without involving AHJ or contractor.
I imagine states have their own requirements, but I am curious if NFPA comments on this.
Obviously, use the same type, size, temp. etc. heads for replacement - possibly chante to corrosion resistant heads.
Thank you.
Can an owner replace 4, 10, 50 heads..... without involving AHJ or contractor.
I imagine states have their own requirements, but I am curious if NFPA comments on this.
Obviously, use the same type, size, temp. etc. heads for replacement - possibly chante to corrosion resistant heads.
Thank you.