I am working with 480V switchracks installed in Non-Classified areas. However, when the racks were bought, it was not clearly known that they would be located in Non-Classified areas, so they were designed and manufactured as Nema 7, Explosionproof, for location in Class 1, Division 2 hazardous locations. As part of the design, line side & load side conduit seals were installed, and to be poured by construction team at jobsite.
I can't find any article in the code that requires the seals to be poured now that they are in Non-Classified areas. Am I missing something, or is there any code that requires all seals to be poured once they are installed?