adeku
Structural
- Jun 15, 2005
- 4
I am designing a very short bridge for a residence. The road leading up to it is also narrow so traffic speeds should not exceed 15 mph. The span of the bridge is 12' and width is also 12', just wide enough for one car. Girders are steel but everything else is wood. There is a requirement in ASCE 7-05 that specifies a 6000# impact point load at 1'-6" above the road level. I have not looked through the latest AASHTO code but I presume the loads are even more conservative there. Is it reasonable to design the guard rail for this 6000# point load because it seems too high.